FEASIBILITY REPORT ON CONSTRUCTION AND ASSEMBLY OF RECHARGEABLE LAMP

  • 0 Review(s)

Product Category: Feasibility Study

Product Code: 00006126

No of Pages: 15

No of Chapters: 6

File Format: Microsoft Word

Price :

₦5000

  • $

TABLE OF CONTENTS

 

CHAPTER ONE

TECHNICAL DETAILS

1.1    COMPONENTS

1.2    PRODUCTION PROCESS                  

1.3    RAW MATERIALS SPECIFICATION AND REQUIREMENT                     

 

CHAPTER TWO

2.0    TECHNICAL FEASIBILITY

2.1    PRODUCTS OR SERVICES TO BE OFFERED:

2.2    PRODUCTION PROCESS                  

2.3    RAW MATERIALS SPECIFICATION AND REQUIREMENT                     

2.4    LAYOUT AND PROCESS PLANNING   

2.5    UTILITIES

2.6    LOCATION

 

CHAPTER THREE

3.0    ORGANIZATION AND MANAGEMENT

3.1    ORGANIZATION CHART

3.2       FUNCTIONS OF EACH PERSONNEL

3.3    LABOUR          

 

CHAPTER FOUR

MARKET SURVEY AND RESEARCH INTRODUCTION

4.1.1     ESTIMATED DEMAND FOR PRODUCT

4.1.1.1     BUYING CRITERIA AND INFLUENCING FACTORS

4.1.1.2     ESTIMATED SUPPLY

4.1.2              ESTIMATED SUPPLY – DEMAND GAP

4.1.3        ESTIMATED OF ANNUAL SALES REVENUE      

 

CHAPTER FIVE

TOTAL PROJECT COST

5.1    CAPITAL COSTS

5.1.2 Land and Building

5.2       PRELIMINARY AND PRE-OPERATIVE EXPENSES

5.3    ADMINISTRATIVE EXPENSES

5.4    PROVISION FOR WORKING CAPITAL

5.5    SUMMARY FOR TOTAL COST OF THE PROJECT

5.6    MEANS OF FINANCE

 

CHAPTER SIX

FINANCIAL VIABILITY OF THE PROJECT

6.1    PROJECTED BALANCE SHEET FOR 5 YEARS 

 

 

 

 

 

 

 

 

 

CHAPTER ONE

TECHNICAL DETAILS

 

1.1   COMPONENTS

rechargeable 6v battery        4

Light Emitting bulb                    5

Plastic                                         1

Flexible wire                               1 roll  

Switch                                         1

Compact Disk                            1

         

1.2   PRODUCTION PROCESS                 

Components:  All the appropriate components were sorted out accordingly.

Components includes:

4 rechargeable 6v battery.

5 Light Emitting bulb

1 Plastic

Flexible wire

1 Switch

1CD

 

Connection of Components       

A light emitting bulb was made available. A layout of all the components on the Compact Disk back was done in accordance with the circuit diagram.

With the aid of a soldering iron, lead, cutters, pliers and other relevant tools, all the components were connected to the back Compact Disk back in accordance with the circuit diagram. Circuits connected include: the light emitting bulb, which works on 6 volt battery.

 

Conclusion:

After the circuit was duly connected, the bulbs and battery were mounted in circuit. The light came on when switched on indicating that the circuit is ok.

 

REASONS FOR THESE STEPS             

The reason for taking these steps is to ensure effective connection. Also to avoid short circuit.

 

1.3   RAW MATERIALS SPECIFICATION AND REQUIREMENT                     

4 Unrechargeable 6v battery.

5 Light Emitting bulb

1 Plastic

Flexible wire

1 Switch

1 CD

 

S/N

Description

Total Quantity

Unit cost (N)

Total Cost (N)

Sources

 

 

Per week

Per month

Per year

Per year

 

 

1

Battery

4

16

192

10.00

1920.00

Local

2

CD

1

1

5

10.00

50.00

Local

3

Light emitting bulb

50

100

1,200

10.00

12000.00

Import

4

Switch 

1

2

10

30

300.00

Local

5

Flexible wire

1

1

4

30

120.00

Local

6

Plastic

1

1

3

30

90.00

Local

 

Click “DOWNLOAD NOW” below to get the complete Feasibility Study

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.

Review


To Comment