ABSTRACT
This
project work titled design and implementation
of a computerized production scheduler assignment
problem approach. Deals with how machine can be assigned to production of goods
in order to minimize cost and time. It gives an introduction of scheduling, the
historical background of the case study and the scope of the study.
TABLE
OF CONTENT
Page
Certification i
Dedication ii
Abstract iii
Acknowledgement iv
Table
of content v
CHAPTER ONE
INTRODUCTION
HISTORICAL BACKGROUND OF THE CASE
STUDY
ORGANIZATIONAL STRUCTURE OF THE
CASE STUDY
SCOPE OF THE PROJECT
AIMS AND OBJECTIVES OF THE
PROJECT
STATEMENT OF THE PROJECT
CHAPTER
TWO
2.0 LITERATURE REVIEW
2.1 OVERVIEW OF ASSIGNMENT
PROBLEM TECHNIQUES
2.2 PRODUCTION SCHEDULING
2.3 PRINCIPLE OF SCHEDULING
2.4.1 SCHEDULING TASK
2.4.2 INTERACTIVE SCHEDULING
CHAPTER
THREE
3.0 SYSTEM ANALYSIS DESIGN
3.1 OVERVIEW OF THE EXISTING
BISCUIT PRODUCTION
3.2.1 SHORT CAKE PRODUCTION
3.2.2 CABIN BISCUIT PRODUCTION
3.3 PROBLEM WITH THE EXISTING SYSTEM
3.4 SYSTEM DESIGN
3.5 ANALYSIS OF THE PROPOSED
SYSTEM
3.6 BENEFIT OF THE PROPOSED
SYSTEM
3.7 INPUT DESIGN
3.8 ARRAY LAYOUT
CHAPTER FOUR
4.0 SYSTEM IMPLEMENTATION,
MAINTENANCE AND EVALUATION
4.1 SYSTEM IMPLEMENTATION
4.2 CHANGEOVER PROCEDURE
CHAPTER
FIVE
5.0 SUMMARY, CONCLUSION AND
RECOMMENDATION
5.1 SUMMARY
5.2 CONCLUSION
5.3 RECOMMENDATION
CHAPTER ONE
1.0
Introduction
Scheduling is a
representation of the time necessary carry out a task and should take account
of the technical requirement of the task, marketing forecast and available
capacity.
Scheduling is a
programme of work to be done or a planned event in a faculty production
scheduling.
A PRODUCTION SCHEDULER:
A product scheduler shows the technique through which set of production tasks
in a factory can be assigned to machines or personal that will be responsible
to a carryout such as tasks, using principle of assignment. There must be an
equal number of tasks to the machine or personal available to carry out.
A product scheduling shows plan for the
Manufacturing or a production of a particular products. This plan must be
perfectly carried out to minimize the cost of production of the products in the
factory. Thus, task time, number of proceeds and the number of available
resources are input for considering using assignment technique.
ASSIGNMENT
TECHNIQUES: This is used to allocate
job to machine in computing. The cost of a production job. Therefore, the
computerization of production scheduler, using assignment techniques would like
to device a minimum cost assignment of a job to a production.
1.1
Historical Background Of The Case Study
Okin biscuit
limited, Offa was incorporated in December 1998 by chief E.O Adesoye after his
visit to Indian and tries of Mr. Kiswadala, Mr. P.E Keshavan and Mr. Vigay were
given the task to monitor the project, as a result of this the structuring and
construction of the factory started immediately and at the same time the
shipment and installation of the machineries into the factory was between
December 1978 and June 1980.
Immediately after the completion of the factory structure and the machine
installation Mr. Keshwadala was made the general manager company while Mr. P.K
Jesharan was appointed the maintenance Engineer of the company, However, the
first production of Biscuit started on 2nd of June 1980 with the
coaster brand. This brand was still in market when another brand called short
cake came out in 1984.
SHORT
CAKE: This short cake product affected the
sales of the coaster brands at the initial stage due to its sweetness but later
in the years, there was equilibrium in their sales and it has made it possible
to found in biscuit within outside Nigeria.
However, the
company initially started with the following department are: Production
Engineering, Accounts and administrative department, but with expansion of its
production capacity, the marketing and security Department, was introduced to
facilitate the prompt sales and marketing of their products and security of the
products by monitoring the works for not stealing biscuit. The company in 1996
introduced another fine products called CABIN, while is still in market but
nevertheless, the company has produced some biscuits, which has been out of
production such as GEM biscuits.
1.2
Organizational Structure of the Case Study
Okin biscuit
limited is structured and organized into various departments namely:
production, accounts, engineering, marketing, security and administrative
department in which each department is headed by a manager and each section is
headed by sectional leader.
However, the
General Manager overseas all activities in the company in which some
responsibilities are assigned to the various head of department.
ORGANIZATION CHART
PRODUCTION
DEPARTMENT
The production
manager heads production department. This department into five section viz:
mixing, cutting oven, packing and store section.
These section are
headed by three supervisors who are rotated on the three working shift.
• MIXING
SECTION: This section is assigned the
responsibility of mixing the various ingredients that are required for the
baking of the biscuit.
• CUTTING
SECTION: This section is where the mixed
biscuits ingredients are cut into shape before it will get into the baking
oven.
•
OVEN
SECTION: In this section the cut biscuit is
baked with an aid of canvass belt, which will carry out the cut biscuit along
the oven down to the parking section
• PACKING
SECTION: This section is responsible for
packing, selection and supplying biscuits to the machine that will help in
sealing the biscuits into the cattophones and at the same time the total
sealing of the carton is done here.
• STORE
SECTION: This section is assigned with
responsibility of keeping both the raw materials for the production and
finished products.
The assumption
made is that each stage has three different machines which can handle the
intended work effectively but the vary capabilities. This research work centre
on how these machines can be combined together in order to achieve our aim of profit maximizing and cost
minimization. This project work will dare not extorting its tentative beyond
the specified of biscuits production.
1.3
Significance of the Study
This
project work is mainly design for a schedule as:
•
The representative which should be
as flexible as possible to enable the
representation of schedules of different application with different resources
and jobs.
•
Support of scheduling tasks initiated
either by a user or durative improvement.
•
Scheduling tasks an immediately
feedback and to fasten the optimization algorithm
•
A schedule while should be an object
that can be copied efficiently
ACCOUNTING
DEPARTMENT: The accounting is headed by chief
accountant who is responsible to the General manager for any financial matter.
This department is responsible for taking care of the financial aspect of the
company.It is also pivot to all other department concerning money or any other financial
report of the organization. They serve as
put where customer pay biscuit bought in the factory. The cashier
manager who is responsible for coordinating the payment of staff salaries
supervisors the salary aspect of the company. The department also works in
collaboration with store section in payment for raw materials brought into the
company.
ENGINEERING
DEPARTMENT: The engineering department is the
department that is responsible for the daily maintenance of the machineries
that are used in the production of the biscuit
Engineering department is divided
into two sections namely; electrical and mechanical engineering department. The
chief engineers are appointed in which one is responsible for monitoring
electrical cases of the machineries and the others.
1.4
Aims and Objectives of the Project
•
The purposes of this research work is to decides the variable that
goes into the decision making process in job scheduling of goods and
services.
•
The project work is also aimed at
looking into problems associated with job scheduling and a suitable solution
using computer design automation.
•
The project works will also
investigate analyze current manual possess of production scheduling at Okin
biscuit Nigeria limited and to introduce computer into this process, using
assignment, introduce computer into the process, using assignment techniques
.
•
The overall objectives of this
project work are to elinate
inappropriate projection scheduling process of the organization under study
and there would be a proper minimization of production period and thus
maximization of profit.
1.5
Statement of the Project
The problem of
this study is to evaluate the manual means of scheduling the job, then develop
a means to tackled these difficulties by using computer system.
1.5.1
Research Question
The research work is embarked with
questions as:
•
Does this production scheduling
described as a problem of satisfying
temporal constraints
•
Would the new proposal system serve
as a guide to several objectives functions
•
What will be the relation that mapped
on a satisfaction degree, which evaluates how good this constraints, is
satisfied in the actual schedule?
•
Does the scheduling system optimally
determine when and on what machine steps
are to be possessed or handled?
1.6
Scope of the Project
This project work
covered three stages out of four stages involve in the production of biscuits,
the three stages; mixing, cutting and baking stages.
The assumption made is that each
stage has three different machines which can handle the intended work
effectively but with vary capabilities. This research work centers on how these
machines can be combined together in order to achieve our aim of profit
maximizing and cost minimization this project work will dare not escorting its
tentative beyond the specified of biscuit production.
Click “DOWNLOAD NOW” below to get the complete Projects
FOR QUICK HELP CHAT WITH US NOW!
+(234) 0814 780 1594
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after
receiving material of the topic you ordered and paid for.
Login To Comment