• $

THE RELEVANCE O STRATEGIC MANAGEMENT IN A COMPETITIVE BANKING ENVIRONMENT (A CASE STUDY OF UNITED BANK FOR AFRICA PLC)

  • 0 Review(s)

Product Category: Projects

Product Code: 00001584

No of Pages: 53

No of Chapters: 5

File Format: Microsoft Word

Price :

$12

  • $

TABLE OF CONTENTS

 

Title page                                                                                            i

Certification                                                                                        ii                     

Dedication                                                                                          iii

Acknowledgement                                                                              iv

Abstract 

Table of contents                                                                               

                                                                                            

           

Chapter One                                   

1.1       Background of the study                                                      

1.2       Purpose of the study

1.3       Statement of the problem

1.4       Significance of the study

1.5       Delimitation of the study

1.6       Definition of the term

             

Chapter Two

Review of Related literature

History and development of banking in Nigeria

2.1       The Nigeria banking environment

2.         Definition of the term

            Definition of strategic management

            The need for planning

            Relevance of strategic management in bank

            Formulation of strategic in banks

            Constraints of United Bank for African Plc

            Effectiveness of strategic planning      

 

Chapter Three

3.0       Research Methodology

3.1       Primary source

3.2       Secondary source

3.3       Reliability and validity

3.4       Population

3.5       Sample size 

3.6       Design of questionnaire

3.7       Administering questionnaire

3.8       Statistical technique and instruments

   

Chapter Four

4.0       Interpretation and presentation of data analysis

4.1       Introduction

4.2       Analysis of data through sample percentage

4.3       Testing of hypothesis using chi-squares   

4.4       Interpretation of result.

 

Chapter Five

5.1       Summary,

5.2       Conclusion     

5.3       Recommendations                                                                 

5.4       References

 

 

                                                   


 CHAPTER ONE

 

1.0       BACKGROUND OF THE STUDY

The history of UBA can be traced to British and French Limited, which originated from BANOGE NATIONAL four Le Commerce etc industries (established in 1832).

Early in 1949, Messer E.E Hunger Buler and C. H. Baker were seconded from Banyae National Pour le Commerce etc industries (established in 1932).

Early in 1949, Messer E. E Hunger Buler and C. H. Baker were seconded from Banyae National pours i.e. commerce etc industries (BNCL) to Lagos, where they were assigned to make initial arrangement for the setting up of the British and French Bank.

In May 1949, the British and French Bank operation in Nigeria at broad street, Lagos which today house apart of Kingsway store complex of February 23rd 1961, its registered office was at 127129 board street Lagos. Mr. F De lajugie was the first general manager with its establishment UBA became the first bank among the international bank operating in Nigeria at the time to be over #4 million. The following United Bank for Africa annual report 1980 pagel were:

                        The British and French bank

Bank nationals del lavaso of study

Monte, de paschi di siena of study

Bankers trust of new York USA

Amstardem Rotherdown Bank at Holland

The bank has grown from its initial one office

Structure in 1961 to 2001 as early 1995, the banks paid up capital has risen to #120 million

 

1.1       PURPOSE OF THE STUDY

a.         To reduce uncertainty in decision making as far as possible by anticipating and planning for future events.

b.         to make management move in a systematic way and form a long term perspective, about concerns and short term decisions.

c.         To ensure that the external environment and trends in it are monitored for potential opportunities and threats.

d.         To provide a mechanism for systematic appraisal of the internal strengths and weakness of the organization.       

e.         To provide a framework against which raw ideals for business development can be checked.

f.          To element in learning and motivation, anabling individuals to appreciate the role gauge than progress and evaluate the exact to which their effort and energy is being constructively spent.    

g.         To organization need a yardsticks against which success or lack of it can be measured (if doesn’t know where its going or won’t know its arrival)

h.         To help management to predict organization behaviour to some extent.

 

1.2       STATEMENT OF THE PROBLEM

The problem include      

i.                    A low growth of out put

ii.                  A persistent depreciation of naira exchange rate and its inflatimary effort on prices.

iii.                High rate of unemployment

iv.                Excessive of high borrowing rate which discourage productive investment

v.                  Reduction activities in the manufacturing sector.

 

1.3       SIGNIFICANCE OF THE STUDY

The main significance of the study is to examine the United Banks for Africa Plc carries out the strategies management in this area of deregulation. This research aims to describe and assess the following.  

i.                    The extent to which the banks engaged in strategic planning

ii.                  The opportunities and threats traced by the banks

iii.                The factor  militating against its competitiveness.

The study shall also take a look at the internal structure at the bank with particular reference to:

i.                    The decision making and planning process

ii.                  The operational strength and weakness

Finally, the study tries to proffer solution ton problems being encountered and recommended alternative strategies.

 

1.4       DELIMITATION OF THE STUDY

The research work which is on strategies management in competitive banking environment requires geographically wide spread and large population in view of the study to the banking environment in Osun State and with special emphasis to the strategic management of UBA Plc Osogbo, as it is possible to visit all the banks in Osun State talk less of that of the whole federation.     

 

1.5       LIMITATION OF THE STUDY

The following limitation must be acknowledged as a great constraints to the study.

a.                   Financial constraints. The economic situation in the country couple with the ever increasing in cost of materials services and other incidental cost imputed. Inputed into this research work made it difficult for the research to be carried out satisfaction.

b.                  Strike action usually embarked upon in the academic environment by academic or non academic alike do create overlap among the academic calendar and bulk of academic work being lump together with other campus activities, thereby not creating enough time chance should be given to student to operate on their research work by the student, the government school and existing in academic activities in campus in that more rooms would be created for research project by the final year students.

 

1.6       DEFINITION OF TERMS

a.         Planning is deciding what to do it, when to do it, and what to do it controlling coordinating organizing to achier the goals and objective

b.         Corporate Appraisal are part of a complex process whereby organization set objectives for them selves and plan how to meet them in a sysmatic fashion.

c.         Objectives are those which are concerted with the goals work the organization as a whole.

d.         Management thus has come to be called human resources management and embraces the personnel functions of man power planning and resources recruitment retention, development and control labour turnover.


Click “DOWNLOAD NOW” below to get the complete Projects

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.

Review


To Comment


Sold By

ProjectShelve

7894

Total Item

Reviews (29)

  • Anonymous

    2 weeks ago

    This is truly legit, thanks so much for not disappointing

  • Anonymous

    2 weeks ago

    I was so happy to helping me through my project topic thank you so much

  • Anonymous

    2 weeks ago

    Just got my material... thanks

  • Anonymous

    3 weeks ago

    Thank you for your reliability and swift service Order and delivery was within the blink of an eye.

  • Anonymous

    3 weeks ago

    It's actually good and it doesn't delay in sending. Thanks

  • Anonymous

    3 weeks ago

    I got the material without delay. The content too is okay

  • Anonymous

    1 month ago

    Thank you guys for the document, this will really go a long way for me. Kudos to project shelve👍

  • Anonymous

    1 month ago

    You guys have a great works here I m really glad to be one of your beneficiary hope for the best from you guys am pleased with the works and content writings it really good

  • Anonymous

    1 month ago

    Excellent user experience and project was delivered very quickly

  • Anonymous

    1 month ago

    The material is very good and worth the price being sold I really liked it 👍

  • Anonymous

    1 month ago

    Wow response was fast .. 👍 Thankyou

  • Anonymous

    1 month ago

    Trusted, faster and easy research platform.

  • TJ

    1 month ago

    great

  • Anonymous

    1 month ago

    My experience with projectselves. Com was a great one, i appreciate your prompt response and feedback. More grace

  • Anonymous

    1 month ago

    Sure plug ♥️♥️

  • Anonymous

    1 month ago

    Thanks I have received the documents Exactly what I ordered Fast and reliable

  • Anonymous

    1 month ago

    Wow this is amazing website with fast response and best projects topic I haven't seen before

  • Anonymous

    1 month ago

    Genuine site. I got all materials for my project swiftly immediately after my payment.

  • Anonymous

    2 months ago

    It agree, a useful piece

  • Anonymous

    2 months ago

    Good work and satisfactory

  • Anonymous

    2 months ago

    Good job

  • Anonymous

    2 months ago

    Fast response and reliable

  • Anonymous

    2 months ago

    Projects would've alot easier if everyone have an idea of excellence work going on here.

  • Anonymous

    2 months ago

    Very good 👍👍

  • Anonymous

    2 months ago

    Honestly, the material is top notch and precise. I love the work and I'll recommend project shelve anyday anytime

  • Anonymous

    2 months ago

    Well and quickly delivered

  • Anonymous

    2 months ago

    I am thoroughly impressed with Projectshelve.com! The project material was of outstanding quality, well-researched, and highly detailed. What amazed me most was their instant delivery to both my email and WhatsApp, ensuring I got what I needed immediately. Highly reliable and professional—I'll definitely recommend them to anyone seeking quality project materials!

  • Anonymous

    2 months ago

    Its amazing transacting with Projectshelve. They are sincere, got material delivered within few minutes in my email and whatsApp.

  • TJ

    4 months ago

    ProjectShelve is highly reliable. Got the project delivered instantly after payment. Quality of the work.also excellent. Thank you