ABSTRACT
This project which is on the design and fabrication
of a two face gas burner is a brief exploration on the various ways and means
of designing, construction, operating the two face gas burner, putting cost
into consideration for economic advantage.
Herein are brief information and literature on gas burner. The properties of the constructional feature
and their preference in construction are described. The combustion reaction resulting to the heat
liberated is also given. Also, the
practical approach in making the construction of a two face gas burner up to
this standard is also given and recommendation to improve on the standard is
also included in this report.
TABLE OF CONTENTS
CHAPTER
ONE
1.1
Introduction
1.2
Literature
review
1.3
Specification
of problem
1.4
Component parts
and their functions
CHAPTER TWO
Construction mechanism /
theory of combustion
2.1
Description of
combustion devices
2.2
Pre mix or
nozzle air blast burner
2.3
Mode of
operation
2.4
Flame
2.5
Ultimate
analysis
2.6
Requirement of
the gas
CHAPTER
THREE
MATERIAL SELECTION
3.1
Properties
3.2
Mid steel
3.3
Brass
3.4
Cast iron
3.5
Hose
3.6
Copper pipe
CHAPTER
FOUR
CONSTRUCTION PROCEDURE
4.1
Tools and
equipment used
4.2
Sequence of
manufacturing
CHAPTER
FIVE
ASSEMBLY OF THE PROJECT
5.1
Front view
5.2
Plan
5.3
Side view
CHAPTER
SIX
COST OF PRODCUTION/COST ANALYSIS
6.1
Design cost
6.2
Material cost
6.3
Machine cost
6.4
Total cost
CHAPTER
SEVEN
MAINTENANCE OF DEVICE
7.1
Safety
precautions
7.2
Testing of the
device
7.3
Recommendation
7.4
Conclusion
7.5
References
CHAPTER ONE
1.1
INTRODUCTION
The
construction of a two-face gas burner as a project topic that we embark upon
become necessary as a way of way of putting into application the engineering
and technological knowledge acquired so far. It is a starting point of
actualizing a functional technology in the country. Irrespective of the fact
that there are several breads of gas burners in the market, especially the ones
imported, we deemed it necessary to work further on it as a way of modifying
the brand with cast not left out in such modification.
1.2 LITERATURE
REVIEW
The
development of simple gas burner started in the eighteen countries when people
began to use coal gas for burning. The application was fast put into practice
by William Mulock who designed the simple gas cooker to be used in his office,
home and workplace
The first
experimental gas cooker was made and in use in 1850. The improvement of this
has multiplied greatly and is up to date widely used in homes, restaurants and
large catering establishments. The different types of gas cookers available in
the in the market are based on skills and techniques of the designer or
producer.
Based on
the nature of energy supply, some gas cookers are made up of combustion devices
of an electric heating element. The well-constructed ones are properly adapted
and form an integral combustion of which of which they generate and utilize
heat. It is often quite different to draw a line where heat generation stops
and where heat utilization starts in a fuel forced cooker. That is the fuel
fired cooker being on the pack in the market these days.
The
releasing of heart starts with mixture of air and fuel gas in the nozzle and
combustion of the mixture to release heart takes place at the burner.
1.3 SPECIFICATION
OF PROBLEM
In the
course of fabricating the two-face gas burner, as a copied project with some
propose modification, some condition which ought to be met are found as a
standard of comparison with the already existing ones. This posed a difficulty
in the course of this construction. Since choice between already existing gas
cooker lies on service available, durability, connivance cost.
The
following specifications were considered a problem when we started the design.
1.
PORTABILITY.
How
to fabricate a two-face gas burner that will occupy the minimum space in the
kitchen was a problem. A two-face gas burner that is easily to be met in met in
our design.
2.
To construct a two-face gas burner that will be safe
to any prospective user.
3.
To constructs a two-face gas burner that will be easy
to maintain and wise gas will be free from unpleasant smell.
4.
To construct a two-face gas burner whose source of
energy (fuel) will be local.
1.4
COMPONENT
PARTS AND THEIR FUNCTIONS
1.
Burner chamber
2.
Linkage pipe
3.
Hose
4.
Gas Cylinder (containing gas valve)
5.
Angle bar (material)
6.
Control knob or valve
7.
Connection pipe for gas flow
8.
Nut
9.
Rod.
THE BURNER: This being the main component
where combustion takes place to release heat. There is gas delivery line, which
leads to it in addition to an adjustment to control the rate of atmospheric air
mixing with the natural gas
LINKAGE PILE: This is the pipe line through which natural gas
flow to the burner. One is lined along the frame of the burner as seen.
THE GAS CYLINDER: This is the
component of the gas burner that containing the gas fuel through which a hose
as connected to the copper pipe of the burner through the gas passes to the
burner for combustion.
THE ANGLE BAR: This was used in constructing the frame of the
gas burner.
HOSE: This serves as a link between the copper tubing
and the control value of the burner
CONTROL KNOB OR VALVE: It
is a essential component of the gas burner and it is used to regulate the
volume or amount of natural gas flowing to the burner.
MILD STELL PLATE this is used as a covering or a wall for the gas
burner. It also serves as a seat for the values.
Click “DOWNLOAD NOW” below to get the complete Projects
FOR QUICK HELP CHAT WITH US NOW!
+(234) 0814 780 1594
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after
receiving material of the topic you ordered and paid for.
Login To Comment