DESIGN AND IMPLEMENTATION OF NYSC ORIENTATION CAMP INFORMATION SYSTEM

  • 0 Review(s)

Product Category: Projects

Product Code: 00003003

No of Pages: 59

No of Chapters: 5

File Format: Microsoft Word

Price :

₦3000

  • $

ABSTRACT

 

This Project Design and Implementation of Orientation Camp Information System (A Case Study of NYSC Orientation Camp Awgu ) was designed to eliminate the problems associated with manual handling of information at the Orientation Camp such as: data redundancy, time wastage etc. The Design and Implementation was carried out using the top down software development approach. The tools used to implement this project are VB.Net and SQL Server.



 

 

 

TABLE OF CONTENTS

 

 

 

Title page

 

 

 

 

 

 

 

 

 

Certification -

 

-  -

-

-

-

-

-

-

i

Dedication- -

-

-

-

-

-

-

-

-

ii

Acknowledgement-

-

-

-

-

-

-

-

iii

Abstract  -

-

 

-

-

 

-

-

-

iv

Table of contents-

-

-

-

-

-

--

 

v

List of figures-

-

-

-

-

-

-

-

-

viii

List of tables-

-

-

-

-

-

-

-

-

ix

 

 

 

 

CHAPTER ONE

 

 

 

 

 

 

 

INTRODUCTION

 

 

 

 

 

 

 

1.1

Background of the project-

-

-

-

-

-

1

1.2

Statement of problems

-

-

-

-

-

-

2

1.3

Objectives of the project -

 

-

-

-

-

 

2

1.4

Justification for the project -

-

-

-

-

-

3

1.5

Scope of the project -

-

-

-

-

-

-

3

1.6

Projects report organization -

-

-

-

-

-

3


 

 

 

 

 

 

 

CHAPTER TWO 


LITERATURE REVIEW

 

 

 

 

 

 

 

2.1 An overview of Nigeria youth service corps -

-

-

5

2.2

Operation of the NYSC scheme -

-

-

-

-

8

2.3

Four phase programme of the NYSC - -

-

-

-

9

2.3.1 Mobilization -   -

-

-

 

-

-

-

-

9

2.3.2 Orientation Programme

-

-

-

-

-

9

2.3.3 Primary Assignment

-

-

-

-

-

-

10

2.3.4 Community Development Service- -

-

 

-

11

2.3.5 Winding programme and Passing out Parade

-

-

12

2.4

Orientation Process for Prospective (NYSC) Members-

13

2.4.1 Orientation course/Duration

-

-

-

-

-

13

2.4.2 Registration-

-

-

-

-

-

-

-

14

2.4.3 Meal ticket/feeding -

-

-

-

-

-

-

15

2.4.4 Accommodation on camp-

-

-

-

-

-

15

2.4.5 Orientation Broadcasting service (OBS) -

-

-

15

2.4.6 Platoon and platoon activities-

-

-

-

-

16

2.4.7 Kit Items/ Mode of Dressing- -

-

-

-

-

17

2.4.8 Discipline-

-

-

-

-

-

-

-

-

17

2.4

.9Security -

-

-

-

-

-

-

-

-

18

2.5

ID Cards-

-

-

-

-

-

-

-

-

18


 

2.5.1 Medical care -

-

-

-

-

-

-

-

18

2.5.2 Camp market-

-

-

-

-

-

-

-

19

2.5.3 Socials-

-

-

-

-

-

-

-

-

19

2.5.4 Posting-

-

-

-

-

-

-

-

-

19

2.5.5 Relocation- -

-

-

-

-

-

-

-

20

2.5.6 Exeat-

-

-

-

-

-

-

-

-

20

2.5.7Religious Activities at Orientation Camp

-

-

-

20

2.5.8 Corps Allowance -

-

-

-

-

-

-

20

2.5

.9 Prominent Activities on Camp

-

-

-

-

21


CHAPTER THREE

 

 

 

 

 

 

 

 

SYSTEM ANALYSIS AND DESIGN

 

 

 

 

 

3.1

Methodology -

-

-

-

-

-

-

-

22

3.1.1 Methods of data collection

-

-

-

-

-

22

3.2

Data Analysis

-

-

-

-

-

-

-

22

3.3

Analysis of the existing system -

-

-

-

-

23

3.4

Limitations of the existing system

-

-

-

-

24

3.5 system design -

-

-

-

-

-

-

-

24


CHAPTER FOUR

 

 

 

 

 

 

 

 

IMPLEMENTATION, TESTING AND INTEGRATION

 

 

4.1

Choice of programming language -

-

-

-

-

31


 

4.2

System requirement -

-

-

-

-

-

-

31

4.2.1 Software requirements -

-

-

-

-

-

31

4.2.2 Hardware requirements -

-

-

-

-

-

31

4.3

Implementation - -

-

-

-

-

-

-

32

4.4.1 Unit testing -

-

-

-

-

-

-

-

35

4.4.2  System testing

-

-

-

-

-

-

-

38

CHAPTER FIVE

 

 

 

 

 

 

 

 

 

SUMMARY, LIMITATIONS AND CONCLUSION

 

 

 

5.1

Summary

-

-

-

-

-

-

-

-

39

5.2

Limitations of the project -

-

-

-

-

-

39

5.3

Bill of engineering measurement

and

evaluation -

-

40

5.4

Conclusion -

-

-

-

-

-

-

-

-

40

 

BIBILIOGRAPHY

 

APPENDIX A:      PROGRAM SOURCE CODE

 

APPENDIX B:      SAMPLE OUTPUT

 

APPENDIX C:      USER GUIDE


 

 

 

 

 

 

 

 

 

LIST OF FIGURES

 

 

 

 

 

 

 

3.1

The NYSC Registration Form

-

-

-

-

-

27

3.2

The Posting Form   -

-

-

-

-

-

-

28

3.3

The System Flowchart

-

-

-

-

-

-

29

3.4

The Top Down Design

-

-

-

-

-

-

30

4.3.1 The NYSC Login Window

-

-

-

-

-

33

4.3.2. Admin Form Window

-

-

-

-

-

-

34


 

LIST OF TABLES

 

 

 

 

 

 

 

Table 1 Unit Testing   -

-

-

-

-

-

-

35

Table 2 project costing -

-

-

-

-

-

-

40


 










CHAPTER ONE

INTRODUCTION

 

1.1 BACKGROUND OF THE STUDY

 

The national youth service corps (NYSC) is an organization set

 by the Nigerian government to invol the development of the country. There is no military conscription in Nigeria, but since 1973 graduates of universities and later polytechnics have been required to take part in the national youth service corps (NYSC) program for one year. This is known as national service year, corps members are posted to cities far from their city of origin. They are expected to mix with people of other tribes, social and family backgrounds, to learn the culture of the indigenes in the place they are posted to. This action is aimed to bring about unity in the country and to help youth appreciate other ethnic groups. There is an orientation period of approximately three weeks spent in a camp away from family and friends. After the orientation process corps members are posted to the areas of primary assignment. There is also a passing out ceremony at the end of the year. The program has also helped in creating entry-level jobs for a lot of Nigerian youths. An NYSC forum dedicated to NYSC members was recently built to bridge the gap amongst members serving across Nigeria and also serves as an avenue for corps members to share job information and career resources as well as get loans from the national directorates of employment.

 

 

1.2 STATEMENT OF PROBLEMS

 

The NYSC is faced with the following problems due to their manual method of handling information:

  • Poor handling of corps members’ information
  • Time wastage in searching for information
  • Data redundancy

1.3   OBJECTIVES OF THE PROJECT 

The objectives of this project are as follows:

  • To design an information system that makes data access easy for corps members.
  • To design a system that can automatically post corps members to their areas of primary assignment.
  • To design a system that can help the NYSC management to supervise corps members.


 

 

 

1.4 JUSTIFICATION OF THE STUDY

 

The good reason why this project is done is to provide an efficient method of handling corps members’ data


1.5 SCOPE OF THE STUDY

 

This project covers the design and implementation of information system for the NYSC orientation camp (A case study of Awgu)

 

 

 

I.6 PROJECT REPORT ORGANIZATION 

The project is organized as follows:

 

Chapter one of this project reports gives the detailed introduction of the project. Chapter two gives a review of the related literature. Chapter three covers the methodology, data collection, analysis of existing system, limitation of the existing system, system design, the database design, system flowchart and the top down design. Chapter four covers implementation, testing and integration. Chapter five gives the summary, limitations of the project, recommendation, bill of engineering measurement and evaluation (BEME) and conclusion.

Click “DOWNLOAD NOW” below to get the complete Projects

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.


To Review


To Comment