DESIGN AND IMPLEMENTATION OF NYSC ORIENTATION CAMP INFORMATION SYSTEM

  • 0 Review(s)

Product Category: Projects

Product Code: 00002942

No of Pages: 52

No of Chapters: 5

File Format: Microsoft Word

Price :

₦3000

  • $

ABSTRACT

This  Project  Design and  Implementation of  Orientation Camp  Information System (A Case Study of NYSC Orientation Camp Awgu ) was designed to eliminate  the  problems associated  with manual  handling  of information at the  Orientation  Camp  such  as:  data  redundancy,  time  wastage  etc.  The Design  and  Implementation  was carried  out  using  the  top  down  software development  approach.  The tools used to implement this project are VB.Net and SQL Server.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TABLE OF CONTENTS

Title page                                                                                          i

Certification                                                                                                ii

Dedication                                                                                         iii

Acknowledgement                                                                                      iv

Abstract                                                                                            v

Table of contents                                                                              iv

List of figures                                                                                    viii

List of tables                                                                                     viii

 

CHAPTER ONE

INTRODUCTION

1.1     Background of the project                                                       1

1.2     Statement of problems                                                            1

1.3     Objectives of the project                                                                   2

1.4     Justification for the project                                                     2

1.5     Scope of the project                                                                2

1.6     Projects report organization                                                    2

 

CHAPTER TWO

LITERATURE REVIEW

2.1     An overview of Nigeria youth service corps                                     4

2.2     Operation of the NYSC scheme                                                        6

2.3     Four phase programme of the NYSC                                               6

2.3.1  Mobilization                                                                            6

2.3.2  Orientation Programme                                                           7

2.3.3  Primary Assignment                                                                7

2.3.4  Community Development Service                                           8

2.3.5  Winding programme and Passing out Parade                                   8

2.4     Orientation Process for Prospective (NYSC) Members           9     

2.4.1  Orientation course/Duration                                                    9 

2.4.2  Registration                                                                                      9

2.4.3  Meal ticket/feeding                                                                  10

2.4.4  Accommodation on camp                                                       10

2.4.5  Orientation Broadcasting service (OBS)                                 10

2.4.6  Platoon and platoon activities                                                 11

2.4.7  Kit Items/ Mode of Dressing                                                   11

2.4.8  Discipline                                                                                12

2.4 .9 Security                                                                                   12

2.5     ID Cards                                                                                  12

2.5.1  Medical care                                                                            12

2.5.2  Camp market                                                                          12

2.5.3  Socials                                                                                     13

2.5.4  Posting                                                                                    13

2.5.5  Relocation                                                                               13

2.5.6  Exeat                                                                                       13

2.5.7  Religious Activities at Orientation Camp                                13

2.5.8  Corps Allowance                                                                     13

2.5 .9 Prominent Activities on Camp                                                          14

 

CHAPTER THREE

SYSTEM ANALYSIS AND DESIGN

3.1     Methodology                                                                           15

3.1.1  Methods of data collection                                                      15

3.2     Data Analysis                                                                          15

3.3     Analysis of the existing system                                                         15

3.4     Limitations of the existing system                                           16

3.5     System design                                                                         16

 

 

CHAPTER FOUR

IMPLEMENTATION, TESTING AND INTEGRATION

4.1     Choice of programming language                                            21

4.2     System requirement                                                                 21

4.2.1  Software requirements                                                            21

4.2.2  Hardware requirements                                                           21

4.3     Implementation                                                                       21

4.4.1  Unit testing                                                                              23

4.4.2  System testing                                                                         25

 

CHAPTER FIVE

SUMMARY, LIMITATIONS AND CONCLUSION

5.1     Summary                                                                                 26

5.2     Limitations of the project                                                                  26

5.3     Bill of engineering measurement   and   evaluation                           26

5.4     Conclusion                                                                              27

BIBILIOGRAPHY                                                                            28

APPENDIX A                                                                                   29

PROGRAM SOURCE CODE                                                                    29

APPENDIX B                                                                                   36

SAMPLE OUTPUT                                                                          36

LIST OF FIGURES       

3.1     The NYSC Registration Form                                                 18

3.2     The Posting Form                                                                    18

3.3     The System Flowchart                                                            19

3.4     The Top Down Design                                                            20

4.3.1  The NYSC Login Window                                                      23

4.3.2  Admin Form Window                                                             24

LIST OF TABLES

Tab 1 Unit Testing                                                                                      25

Tab 2 Project costing                                                                         27

 

 

 

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND OF THE STUDY

The national youth service corps (NYSC) is an organization set by the Nigerian government to involve the country’s graduates in the development of the country. There is no military conscription in  Nigeria,  but  since  1973  graduates  of  universities  and  later polytechnics have been required to take part in the national youth service  corps  (NYSC)  program  for  one  year.  This is known as national service year, corps members are posted to cities far from their city of origin. They are expected to mix with people of other tribes, social and family backgrounds, to learn   the culture of the indigenes in the place they are posted   to. This action is aimed to bring  about  unity  in  the  country  and  to  help  youth  appreciate other ethnic  groups.  There is an orientation period of approximately three weeks spent in a camp away from family and friends. After the orientation process corps members are posted to the areas of primary assignment. There is also a passing out ceremony at the end of the year. The program has also helped in creating entry level jobs for a lot of Nigerian youths. An NYSC forum dedicated to NYSC members was recently built to bridge the gap amongst members serving across Nigeria and also serves as an avenue for corps members to share job information and career resources as well as get loans from the national directorates of employment.

1.2     STATEMENT OF PROBLEMS

The NYSC is faced with the following problems due to their manual method of handling information:

·        Poor handling of corps members’ information

·         Time wastage in searching for information

·        Data redundancy

 

1.3     OBJECTIVES OF THE PROJECT

The objectives of this project are as follows:

·        To design an information system that makes data access easy for corps members.

·        To design a system that can automatically post corps members to their areas of primary assignment.

·        To design a system that can help the NYSC management to supervise corps members. 

 

1.4     JUSTIFICATION OF THE STUDY

The good reason why this project is done is to provide an efficient method of handling corps members’ data at the orientation.

 

1.5     SCOPE OF THE STUDY

This project covers the design and implementation of information system for the NYSC orientation camp (A case study of Awgu)

 

1.6     PROJECT REPORT ORGANIZATION

The project is organized as follows:

Chapter one of this project reports gives the detailed introduction of the project. Chapter two gives a review of the related literature.

Chapter three covers the methodology, data collection, analysis of existing system, limitation of the existing system, system design, the database design, system flowchart and the top down design.

Chapter four covers implementation, testing and integration.

Chapter five  gives  the  summary,  limitations  of  the project,  recommendation,  bill  of  engineering  measurement  and evaluation (BEME) and conclusion.

Click “DOWNLOAD NOW” below to get the complete Projects

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.


To Review


To Comment