ABSTRACT
In
the mechanical Engineering department of institute of management and technology
there and many machines but not all in are good shape or form.
This may be due
to inadequate maintenance, which is evident in the breakdown of air
conditioner. In the case of machine maintenance, the quality and effusiveness
of material were well noted. Also not left behind was the cost of maintenance
which was minimized and yet getting to a highly successful repairs too.
In so long, during the repairs and
rehabilitation of a faulty air conditioner appropriate tools, cost and quality
of material were well considered.
TABLE
OF CONTENT
Title page
Letter of
transmittal
Approval page
Dedication
Acknowledgement
Abstract
Table Of Content
CHAPTER ONE
1.0
Introduction
1.1 literature
review
CHAPTER TWO
2.0
Analysis of the air conditioning cycle
2.1 air
conditioning maintenance
2.2
Preparation for repairs
2.3
Fault detection and repairs
2.4
Precaution taken
2.5
The principles of operation of an air conditioner
2.6
Component of air conditioner
2.7
Air condition application
2.8
Sequence of operation
2.9
Cost analysis
CHAPTER THREE
3.1
Conclusion
3.2
Recommendation
Reference
CHAPTER ONE
1.0
INTR9ODUCTION
1.1 LITERATURE
REVIEW
Air conditioning is a process whereby
heat received from a low temperature region is transferred to a higher
temperature region. Then a negative net
work is being done in the system. Air
conditioning system has four basic components which are the compressor,
condenser, metering device or thrilling valve and an evaporator. When any of these component is faulty or
damaged it will cause the air condition system not to function well or not
functioning at all.
In the first place the faulty air
conditioner was rehabilitated as a project by a group of students in the
department of mechanical engineering 2004/2005 session.
Before working in the air conditioner
by the group in the year 2005 the following fault were dictated.
1.
It has low pumping that is the compressor not pumping any
gas (refrigerant) in the system.
2.
The capacitors of the fan and compressor are bad.
3.
The drier was not able to filter the gas pumped by the compressor
as result of blockage by impurities.
4.
The whole system was dirty, this is because the air
conditioner have been dumped for a very long time.
The
compressor is the heart of all air conditioning system. It pumps the refrigerant to the whole system.
The metering
device or the expansion device meters a given quality of refrigerant required
for each unit.
In this case most of these essential
components of the air conditioner which seems to be very delicate, need not be
handled carelessly, when it developed any fault and again, it should not be
handled by non-exports in the field of air conditioning and refrigeration.
The last group that handled the
project are classified as non-exports in the field of air conditioning. We say this because an air conditioning
system that has the problems outlined above needs not be repaired as they had
done without replacing some of the components with a brand new spare parts and
the normal size that is the size of the machine air conditioner
For instance a compressor that has low
pumping action, we verified that the compressor which supposed to b e two horse
power (2hp) compressor. This under sized
compressor has low pumping action, 6to the air conditioning set. Because the capillaries for the two horse
power compressor for the bigger than that of 1.5 horse power air conditioning
set.
Again the volume of air conditioning
gas being pumped was too negligible to bring about the desired cooling.
The capacitors which was bad that is
not good at all.
The drier which was blocked up by
impurities was changed and replaced with a new one. As a result, its caused by poor cycling of
refrigerant through. The copper
capillary of the air conditioner which we repaired by replacing the drier with
a new one. Through we can still be in a good condition.
A repaired and rehabilitated equipment
is supposed to be sound both internally and externally. The people who worked in the air conditioner
before, were unable to spray the air conditioner which has many scratches as a
result of their work.
Sincerely speaking and other criteria
that contributed immensely to the braked own of the air conditioner was poor
maintenance.
Plant maintenance is the upkeep of
plant safe working state. Plant
maintenance is divided in to planned preventive and breakdown maintenance were
sub-divided.
Thus this report encomprises, urges
the series of job done to arrive at a meaningful randy to breakdown problem.
Considering space, volume and
relevance we will limit our write up (thesis) to the direct and practiced work
of all the air conditioner.
In the first place we used the basic
procedure in tracing a fault like diecking of leakage with soap solution was
done, flushing of the condenser which revealed the fault of the drier (filter)
was done using vacuum pump. The
compressor was tasted, there was no fault only that the size was 1.5 horse
power (hp) and they have opened the compressor before and welded it which is
not advisable to do.
The general dean up of all dust
compacted parts was done particularly without any problems following by the
changing of the plug which supply electricity to the system.
The sequence of operation and fools
used during the repair is recorded in ascending order over leaf.
Click “DOWNLOAD NOW” below to get the complete Projects
FOR QUICK HELP CHAT WITH US NOW!
+(234) 0814 780 1594
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after
receiving material of the topic you ordered and paid for.
Login To Comment