ABSTRACT
Class
work alone on measurement of building work is not enough to equipped the
student with the required knowledge and skill required on the measurement of
building work, in accordance with standard procedure laid down by
BESMM3(Building & Engineering Standard Method of Measurement). It is
against this background that the introduction of project work was introduce to
expose the student to practical and theoretical method of taking off of
building work apart from class work so as to increase their skill and knowledge
in addition to class work.
The
chapter one of this project demonstrate the aims, objectives of this research
and the scope and limitation while the chapter two and three represent a
literature review on the procedure of measurement of building work in order to
have a better understanding of taking off, abstracting and billing processes
prepared in chapter four for the proposed four (4) bedroom fully detached
duplex.
TABLE
OF CONTENTS
Title Page
i
Certification ii
Dedication iii-iv
Acknowledgment v
Abstract vi
Table of Content vii
CHAPTER
ONE
1.0
Introduction 1
1.1
Description of Work 1
1.2
Aims and Objective 2
1.3
Scope and Limitation 3
CHAPTER
TWO
2.0 Literature
Review (Introduction) 4
2.1 Site
Report 4
2.2 Preliminaries 6
2.3 Process
Involved in preparing an un-priced bill
of quantities 9
2.4 Format
of bill of quantities 10
CHAPTER
THREE
3.0 Process
Of Preparing A Bill Of Quantities 14
3.1 Taking
off processes 14
3.1.1 Studying
the Drawing 14
3.1.2 Query
Sheet 15
3.1.3 Taking
Off list 17
3.1.4 Read
and Scale Dimension 18
3.1.5 Taking
Off sheet 19
3.1.6 Recording
of scaled or read dimension 21
3.1.7 Waste
Calculation 23
3.1.8 Signposting 24
3.2 Squaring 25
3.3 Unit
Of Measurement 22
3.3.1 Linear
Meter (m) 22
3.3.2 Square
Meter (m2) 22
3.3.3 Cubic
Meter (m3) 22
3.3.4 General
Item (nrs) 22
3.3.5 PCs/PS 22
3.4 Abstracting 26
3.5 Billing 28
3.5.1 Groundwork 28
3.4.2 Super structural
work. 28
CHAPTER
FOUR
4.0 Introduction 30
4.1 Taking
Off For The Complete Four (4)
Bedroom
Fully Detached Duplex. 30
4.2 Abstracts 30
4.3 Bill of
Qualities for the Substructure
(Groundwork)
only. 30
4.4 Taking
Off the Superstructure 30
CHAPTER
FIVE
5.0 Summary 31
5.1 Conclusion 32
5.2 Recommendation 32
CHAPTER
ONE
1.0 INTRODUCTION
In partial fulfillment
for the requirement of the award of National Diploma (ND) in Quantity
Surveying, student will have to demonstrate what have been taught in class and
outside the class during SIWES.
Thus, this project which is a group work
is aimed at taking off and preparing a Un-Priced Bill of Quantities for the
proposed Four (4) Bedroom Fully Detached Duplex at plot 3003A and 3003B Sanbowlugbe
East Extension Layout Cadastral Zone 07-07 Abuja Nigeria.
This project is also aimed at exposing
us to practical aspect of what were not taught in class and also enable us know
more better about what has already been taught in the class.
1.1 DESCRIPTION OF WORK
The project as it is
fully shown on the building drawing or plan is the construction of a proposed
four (4) Bedroom fully detached, duplex at 3003A and 3003B Sambowlugbe East Extension
layout cadastral Zone 07-07 Abuja, Nigeria, for: Rainbow workstation service
Ltd.
This project work includes the process
of taking off for the building, abstracting and the process of preparing an
un-priced bill of quantities for substructural work only.
1.2 AIMS & OBJECTIVES
1.2.1
AIMS
The aim of this project
work is to prepared a taking off for quantities completely for four (4) bedroom
fully detached duplex and to prepare an abstract and un-priced bill of
quantities for the sub structural work.
1.2.2 OBJECTIVES
In order to achieve the
aforementioned aims, the following objectives are carried out.
-
To prepare literature review of some
terms for better understanding of the little of the project.
-
To prepare a taking off and squaring
quantities for four (4) bedrooms fully detached duplex.
-
To prepare an abstract for substructure
work only.
-
To prepare an un-priced bill of
quantities for substructure work only.
1.3 SCOPE AND LIMITATION
The scope of this work
is limited to the processes that are involved in taking off and preparing an
un-priced bill of quantities for building work but excluding the abstracting,
un-priced bill of quantities and service for super structural work.