TABLE OF CONTENTS
1. PRODUCT AND ITS USES
2. MARKET AND ITS POTENTIAL
3. PRODUCTION TARGET
4. PRODUCTION DETAILS AND PROCESS OF MANUFACTURE
5. QUALITY CONTROL AND STANDARDS
6. LAND AND BUILDING
7. MACHINERY AND EQUIPMENT
8. STAFF AND LABOUR (PER MONTH)
9. RAW MATERIALS AND PACKAGING MATERIALS (PER MONTH)
10. UTILITIES
11. OTHER EXPENSES
12 WORKING CAPITAL (PER MONTH)
12. TOTAL CAPITAL INVESTMENT
13. COST OF PRODUCTION (PER ANNUM)
14. TOTAL SALES (PER ANNUM)
15. PROFITABILITY (PER ANNUM)
16. BREAK- EVEN ANALYSIS
17. DELEGATION/ASSIGNMENT OF DUTIES
1. PRODUCT AND ITS USES
The
product to be produced is PARAKILL Insecticide. The production process
involves the collection of some chemical materials such as D.D.V.P,
I.P.A, Phenol, Formalin, Industrial Camphor and Kerosene etc.
Based
on our survey, we realize that most people need insecticide at home,
and there is no how in a compound you will not found parasite.
Initiative behind producing this Insecticide. The use of this
insecticide will prevent malaria and sickness within the surroundings
and keep the environment clean and hygienic.
2. MARKET AND ITS POTENTIAL
This
product has competitors like Raid and Moretein, etc but, what we
believe is that, there will always be a market for this product. For us
to have a good market for this product, we got samples of similar
product to see what is lacking and insufficient in terms of quality,
packaging, branding, price and also quantity. The raw materials
suppliers are listed below:
Raw Materials | Supplier |
D.D.V.P | Loko Chemicals, Ojota Lagos |
I.P.A | Loko Chemicals, Ojota Lagos |
Plastic Pack | God’s time Ventures, Mushin Lagos |
Phenol(Oil Soluble) | Loko Chemicals, Ojota Lagos |
Formalin | Loko Chemicals, Ojota Lagos |
Industrial Camphor | Loko Chemicals, Ojota Lagos |
Kerosene | General Filling Station, Mafoluku Oshodi Lagos |
Our
Product was sold within and outside the College. We went as far as
going to Oshodi Market, Yaba Market to sell to the Market Women and Men;
Students. Basically, our Location is Yaba College of Technology, but
since the product is meant for general use it will have to go round the
entire Nation. The Unit price of the product is N200.00 only and we have
been able to sell 150 copies of the product.
2. PRODUCTION TARGET
The
Total population of Yaba College of Technology Students and Staffs is
about forty thousand (40000) and majority use insecticide at home and
also we have traders in the College that have come to make their ends
meat and will also need this product at home. The target is to produce
more than what will be sufficient for the people within and outside the
College. We are expecting workers to work for 260 days in a year
(5days/week), by this we can calculate our annual production to be at
least 1,800,000 units of the product.
- PRODUCTION DETAILS AND PROCESS OF MANUFACTURE
v Pouring of kerosene into 20liters plastic
v Add D.D.V.P into the plastic
v Add I.P.A into the same plastic
v Add the grinded Industrial Camphor
v Add phenol and Formalin into the plastic and cover it, then shake very well
v Then the product can now be packaged into packs as desired by the producer.
- QUALITY CONTROL AND STANDARDS
To
prevent the production of the fake of this product we will have to
register with the SON, NAFDAC and the Manufacturers association of
Nigeria (MAN), so that we will be able to get their seal of quality
after all standards had been met. The quality of the product will be
according to the Standard. Safety of the employees, immediate users and
the Community at large is also a standard that should be met.
Click “DOWNLOAD NOW” below to get the complete Feasibility Study
FOR QUICK HELP CHAT WITH US NOW!
+(234) 0814 780 1594
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after
receiving material of the topic you ordered and paid for.
Login To Comment