FEASIBILITY REPORT ON PRODUCTION OF INSECTICIDE

  • 0 Review(s)

Product Category: Feasibility Study

Product Code: 00005688

No of Pages: 11

No of Chapters: 17

File Format: Microsoft Word

Price :

₦5000

  • $

 TABLE OF CONTENTS

 

1.           PRODUCT AND ITS USES

2.       MARKET AND ITS POTENTIAL

3.           PRODUCTION TARGET

4.           PRODUCTION DETAILS AND PROCESS OF MANUFACTURE

5.           QUALITY CONTROL AND STANDARDS

6.           LAND AND BUILDING

7.           MACHINERY AND EQUIPMENT

8.           STAFF AND LABOUR (PER MONTH)

9.           RAW MATERIALS AND PACKAGING MATERIALS (PER MONTH)

10.        UTILITIES

11.        OTHER EXPENSES

12        WORKING CAPITAL (PER MONTH)

12.        TOTAL CAPITAL INVESTMENT

13.        COST OF PRODUCTION (PER ANNUM)

14.        TOTAL SALES (PER ANNUM)

15.        PROFITABILITY (PER ANNUM)

16.        BREAK- EVEN ANALYSIS

17.    DELEGATION/ASSIGNMENT OF DUTIES

 

 

 

 

 

 

 

1.   PRODUCT AND ITS USES

The product to be produced is PARAKILL Insecticide. The production process involves the collection of some chemical materials such as D.D.V.P, I.P.A, Phenol, Formalin, Industrial Camphor and Kerosene etc.

Based on our survey, we realize that most people need insecticide at home, and there is no how in a compound you will not found parasite. Initiative behind producing this Insecticide. The use of this insecticide will prevent malaria and sickness within the surroundings and keep the environment clean and hygienic.

2.      MARKET AND ITS POTENTIAL

This product has competitors like Raid and Moretein, etc but, what we believe is that, there will always be a market for this product. For us to have a good market for this product, we got samples of similar product to see what is lacking and insufficient in terms of quality, packaging, branding, price and also quantity. The raw materials suppliers are listed below:

Raw Materials

Supplier

D.D.V.P

Loko Chemicals, Ojota Lagos

I.P.A

Loko Chemicals, Ojota Lagos

Plastic Pack

God’s time Ventures, Mushin Lagos

Phenol(Oil Soluble)

Loko Chemicals, Ojota Lagos

Formalin

Loko Chemicals, Ojota Lagos

Industrial Camphor

Loko Chemicals, Ojota Lagos

Kerosene

General Filling Station, Mafoluku Oshodi Lagos

 

Our Product was sold within and outside the College. We went as far as going to Oshodi Market, Yaba Market to sell to the Market Women and Men; Students. Basically, our Location is Yaba College of Technology, but since the product is meant for general use it will have to go round the entire Nation. The Unit price of the product is N200.00 only and we have been able to sell 150 copies of the product.

2.   PRODUCTION TARGET

The Total population of Yaba College of Technology Students and Staffs is about forty thousand (40000) and majority use insecticide at home and also we have traders in the College that have come to make their ends meat and will also need this product at home. The target is to produce more than what will be sufficient for the people within and outside the College. We are expecting workers to work for 260 days in a year (5days/week), by this we can calculate our annual production to be at least 1,800,000 units of the product.

  1. PRODUCTION DETAILS AND PROCESS OF MANUFACTURE

v  Pouring of kerosene into 20liters plastic

v  Add D.D.V.P into the plastic

v  Add I.P.A into the same plastic

v  Add the grinded Industrial Camphor

v  Add phenol and Formalin into the plastic and cover it, then shake very well

v  Then the product can now be packaged into packs as desired by the producer.

 

  1. QUALITY CONTROL AND STANDARDS

To prevent the production of the fake of this product we will have to register with the SON, NAFDAC and the Manufacturers association of Nigeria (MAN), so that we will be able to get their seal of quality after all standards had been met. The quality of the product will be according to the Standard. Safety of the employees, immediate users and the Community at large is also a standard that should be met.



Click “DOWNLOAD NOW” below to get the complete Feasibility Study

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.


To Review


To Comment