DESIGN AND IMPLEMENTATION OF COMPUTER BASED INFORMATION SYSTEM FOR NATIONAL POPULATION COMMISSION

  • 0 Review(s)

Product Category: Projects

Product Code: 00005759

No of Pages: 38

No of Chapters: 5

File Format: Microsoft Word

Price :

₦3000

  • $

TABLE OF CONTENTS


CHAPTER ONE

1.0    INTRODUCTION

1.1    BRIEF HISTORY OF NATIONAL POPULATION COMMISSION

(NPC).

1.2    STATEMENT OF THE PROBLEM

1.3    OBJECTIVES OF THE STUDY

1.4    SIGNIFICANCE OF THE STUDY

1.5    SCOPE AND LIMTATION OF THE STUDY

1.6  ORGANZATION OF THE STUDY

1.7    DEFNITION OF TERMS USED IN THE STUDY

 

CHAPTER TWO

REVIEW OF THE RELATED LITERATURE

2.0    INTRODUCTION

2.1     FUNCTIONS OF THE NATIONAL POPULATION COMMISSION

2.2     ORGANIZATION OF NATIONAL POPULATION COMMISSION.

2.3     DEFINITION OF SYSTEM:

2.3.1 INFORMATION SYSTEM:

2.3.2 TYPES OF INFORMATION SYSTEM

2.4     OLD METHOD OR MACHINE USED IN POPULATION CENSUS      

2.5     NEW METHOD OR MACHINE USE IN POPULATION CENSUS

2.6     USES OF COMPUTER IN POPULATION CENSUS

2.7     DISADVANTAGES OF COMPUTER IN POPULATION CENSUS

 

CHAPTER THREE

SYSTEM ANALYSIS AND DESIGN

3.0     INTRODUCTION:

3.1     REVIEW OF EXISTING SYSTEM

3.1.1 ORGANIZATIONAL CHART OF NPC

3.3     PROBLEMS OF EXISTING SYSTEM

3.3     JUSTIFICATION OF THE NEW SYSTEM

3.4     SYSTEM DESIGN

3.5     FILE STRUCTURES 

3.6     SYSTEM BLOCK DIAGRAM

3.7     SYSTEM FLOW CHART

3.8     CHOICE OF PROGRAMMING LANGUAGE

 

CHAPTER FOUR

4.0     SYSTEM IMPLEMENTATION

4.1     SYSTEM TESTING

4.2     REPORT GENERATION

4.3     CONVERSION PROCEDURE

4.4     TRAINING

4.5     REQUIREMENT OF THE NEW SYSTEM

4.6     DOCUMENTATION / PROCEDURE

4.7     MAINTENANCE AND REVIEW OF SYSTEM

 

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECMMENDATION

5.0     SUMMARY

5.1    CONCLUSION

REFERENCES

APPENDIX A: SCREENSHOTS

APPENDIX B: SOURCE CODE

 







 

CHAPTER ONE

1.0     INTRODUCTION

Population census information system is at the centre of all population activities. Population census is the complete process of collecting, compiling, evaluating, analyzing and publishing demographic, economic and social data of all persons in a country or area at a specific time. To make a successful census exercise, the people for whom the arrangement has been made must properly be educate and fully informed about the arrangements.

In other words publicity, public enlightenment and education on the subject of census are unavoidable pre-conditions for a successful exercise. This duty though significant, is only additional to the National Population Commission (NPC). The commission can therefore not commit much of its resources to it, for cannot handle the assignment professionally the way the media do. This is because the most potent strategies and the technical format for effective publicity of any event belong to and remain with the media. What this suggests is that the NPC has no option but to evolve, nurture, cherish and sustain a cordial relationship between the media. 

 

1.1 BRIEF HISTORY OF NATIONAL POPULATION COMMISSION (NPC).

The National Population Commission (NPC) has its based from Calabar from where it was called “Bureau of Population”. In 1988, it became imperative that Akwa Ibom was deed fit for it establishment. As at then, Mr. Isaac Udoukpong was the Head and as Acting Assistant Director, and as at this time, the commission office was located at No. 2 oku street in Uyo Local Government Area of Akwa Ibom State.

In 1990, the name “Bureau Of Population” was changed to National Population Commission (NPC) in preparation for the 1991 National Census Exercise. After the 1991 census, Mr. N. A. Nsudu took over as the state director. The present state Director is Mr. Benjamin Isaac Nda-Obong. Mr. Francis Mosses Ekpo is the Honorable Commissioner representing Akwa Ibom Satae at the board of the commission. He works here in Akwa Ibom state and also in Abuja. Mr. Mfoniso Umoden is the head of population management while Mrs. Mercy Darnley is the comptroller in NPC Uyo L.G.A  office.

In November 2012, Chief Iheama Duru was appointed the chairman of National Population Commission. She has 37 commissioners working her, one from each state of the country and F.C.T inclusive. Finally, the office of the NPC is located at No. 15 Akpan Essien Lane in Uyo L.G.A of Akwa Ibom state.

1.2     STATEMENT OF THE PROBLEM

In ancient days, National Population Commission (NPC) usually process their data or records manually, which makes the whole work so boring, delaying and cannot keep up-to-date records or data. Storage facility was too poor and cannot give a genuine and accurate result at the end of the exercise because they will be carrying data from one place to another. There is always a tendency for NPC to lose their records and data collected during the programmed and their result cannot be accurate or reliable at the end of the exercise.

Since this has been their problems before now, there is a way out before 2016 population census begins, which is to set up a competent computer for the storage of information gathered by designing a data base system for their used. This data base system will solve their problems of saving, retrieving, and compiling, keeping up-to-date data and for easy use in case of emergency need. Finally their staff has to be train on how to operate the propose system.


1.3     OBJECTIVES OF THE STUDY

The objective of this study is to design and implement a computer-based Information System for National population Commission that will assist in maintaining up-to-date and accurate information in the following areas:

(1)       Determining the total number of persons in a particular area.

(2)       Determining the gender composition, marital status and occupation of the population at different administrative divisions e.g

(i)          Helping in individual identification

(ii)       Knowing the level of literacy and illiteracy

(iii)     Knowing the level of employed and unemployed

(3)       To project for future needs and realistic future development.

         

1.4     SIGNIFICANCE OF THE STUDY

Since Population census Information System is very important, especially with the proposed 2016 census that is up coming, the significance of this study is to assist in the following areas:

(1)  EDUCATION: Data collection from population census will assist government in determining

(i)                The number of people who can read and write.

(ii)             The level of educational status for the literate.

(iii)           The number of school age children who are presently not in school

(iv)           The number of schools to be provided.

(2)  HEALTH: Data collected will assist government at all-levels in planning for the information on

(i)                Numbers of people and their health needs

(ii)             The amount of money budgeted for health needs

(iii)           The number of hospitals to be provided.

(3)  ASSESSMENT OF DEVELOPMENT PROGRAMS: Data collected will provide basis for evaluation of various development programs undertaken by the government.

(4) EMPLOYMENT: This will assist in establishing the levels of employment/unemployment for future planning and for job creation by providing the following information:

(i)                Number of employed persons and type of work

(ii)             Distribution of unemployed persons

(iii)           Number of persons in schools that will require employment in the near future.


1.5     SCOPE AND LIMTATION OF THE STUDY

Since this topic population Census Information system is very wide, the scope of this research work is only on head counting and is within Uyo local Government Area with estimated villages under National Population Commission (NPC) uyo.

 

1.6     ORGANZATION OF THE STUDY

This project research is divided into five chapters: chapter one will provide the general introduction of the population census information system, statement of the problems, objectives, significance, scope/limitation of the study and definitions of terms used. Chapter two will consists of the review of the related literature. Chapter three will be system analysis and design, chapter four will be system testing and implementation. And chapter five will give the summary, recommendations and conclusion of the whole project.

 

1.7     DEFNITION OF TERMS USED IN THE STUDY

(1)             For the purpose of clarity in this research project work, and to avoid any geographical area at a particular time.

(2)             CENSUS: The source of the word “census” is from the verb ‘censere’ which means contrary to what is expected, not ‘to count’ but rather ‘to assess’ or ‘to estimate’ (The Encyclopedia American, 1951). Census is therefore the procedure of systematically acquiring and recording information about the members of a given population.

(3)             POPULATION INFORMATION: It is an act and process of creating awareness, enlightenment and educating the general public in population activities methods (Ahmed Hameed NPC 1991 Analysis).

(4)             SYSTEM: The term “system” originates from the Greek term systema, which means to “place together”. System is defined as a collection of related components that interact to perform a task in order to accomplish a goal.

(5)              POPULATION DATA: Is the collection of facts and figures in relation to the demographic structures of a nation.

(6)             ENUMERATION AREA DEMARCATION (EAD): Is the division of the entire land area of the country into small units that a pair of enumerators can conveniently cover within the period.

(7)             COMPUTER: Is an electronic machine that can accept data, process data and generate a result.

(8)             DEMOGRAPHIC: This is the statistical data of a population, especially those showing average age, income, education etc.

confusion on the use of words, the following terms is given definition.

(9)         POPULATION: This refers to the total number of people living within a society



Click “DOWNLOAD NOW” below to get the complete Projects

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.


To Review


To Comment